jobs bidding

Access the Full Project by Clicking here!

- SIGN UP -
Experience Simplicity
 
 
 
 
 
JOB
(CMAR) 2100 South Capacity Upgrade
BID DATE
04/24/20 - 2:00
AGENCY
Salt Lake
ESTIMATE
n/a
SCOPE
AWARD AUGUST 2020: The existing sewer is 12-inch sewer line with a mixture of CIPP lined VCP, unlined VCP, UCP (unreinforced concrete pipe), and PVC. It will need to be upsized to 15-inch and 18-inch pipe for capacity needs. Manhole replacement and lateral reconnection will be part of this project. An additional task of re-routing the sewer line from MH 22490 to MH 22404 may be added to the project. That line connects a manhole near Highland High School to the main line in the street. Currently, the line runs under an athletic field and is inaccessible for maintenance. The consultant will need to provide preliminary design, final design, public engagement, property procurement support, permitting support, and construction phase services for the 2100 South Capacity Upgrade project. Kevin Kranendonk +801 (483) 6841 kevin.kranendonk@slcgov.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT