Buena Vista Avenue Railroad Avenue Improvement
BID DATE
03/18/14 - 2:00
AGENCY
Santee
ESTIMATE
$1,850,000
SCOPE
Work includes the furnishing of all labor, materials and equipment necessary for the replacement of existing corrugated metal pipe (CMP) storm drain and pavement rehabilitation including but not limited to; reinforced concrete storm drain pipe (RCP), storm drain structures, street lighting, signal video detection, pedestrian ramps, concrete curb and gutter, concrete sidewalks, asphalt concrete pavement, aggregate base, roadway striping, traffic control, demolition, excavation, utility coordination, and all related and necessary work as defined in the contract documents. Contact: John Keane, P.E. 619-258-4100 ext 169, fax 619-562-9376. Email: JKeane@cityofsanteeca.gov