jobs bidding

Access the Full Project by Clicking here!

- SIGN UP -
Experience Simplicity
 
 
 
 
 
JOB
2020 Roadway
BID DATE
04/2/20 - 11:00
AGENCY
Orem
ESTIMATE
$2,200,000
SCOPE
DESCRIPTION OF WORK: The WORK includes 52,500 SY of 1.5” edge mill and 2” overlay PG 64-34 with superpave additives, 15,000 SY of 2” profile mill and 2” overlay PG 58-28 with superpave additives, 5,000 SY of road reconstruction (4” PG 58-28 over 8” untreated base course), 4,750 SY of road reconstruction (4” PG 58-28 over 8” cement treated base), 7,000 SY of road reconstruction (4” PG 58-28 over 12”-21” of untreated base course), 9 speed tables, 500 LF of B3 concrete curbing, 750 SF of 9” stamped concrete, 60 modified ADA ramps, 250’ of monolithic curb, gutter, and sidewalk, 100’ of concrete cross gutter, 18 pre-treatment catch basins, 17 60” Ø sumps, and 260’ of 12” SDR35 PVC. The engineer’s estimate for the work is $2,200,000 to $2,400,000. SITE OF WORK: The site of the WORK is located at 1800 N (From 800 W to State St.), 760 W (From 1800 N to 1725 N), 1725 N (From 760 W to State St.), upper portion of the Orem City Cemetery (North of the Murdock Canal Trail), Palisade Drive (From Center St. to 800 N), Main St. (From 1600 S to University Ave.), and the entirety of 140 East.
PREBID
3/25/2020 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT