jobs bidding

Access the Full Project by Clicking here!

- SIGN UP -
Experience Simplicity
 
 
 
 
 
JOB
Downtown Paving Sanitary Sewer Rehab Phase I
BID DATE
04/2/20 - 2:00
AGENCY
Mill Valley
ESTIMATE
$1,900,000
SCOPE
Sanitary sewer, storm drain, and roadway rehabilitation work in various locations throughout the City. Sanitary sewer rehabilitation work includes rehabilitation of existing gravity sanitary sewer pipelines by opencut removal and replacement, pipe bursting and cured-in-place pipe (CIPP) methods, including but not limited to, shoring, pipe spot repairs, pipe sag repairs, replacing laterals, disconnecting and reinstating lateral connections, abandoning existing sewer pipelines and manholes, constructing new manholes and cleanouts, landscape restoration, CCTV inspection, and bypass pumping of sanitary sewer flows. Storm drain rehabilitation work will include construction of new gravity storm drain pipelines by open-cut methods and rehabilitation or existing storm drain by CIPP methods, installation of new catch basins and manholes. Roadway rehabilitation work will include mill and HMA overlay rehabilitation method, including but not be limited to, pavement base repairs, pavement milling, sawcutting, striping and pavement markings and curb ramp installation aaaly@cityofmillvalley.org
UPDATES
  • 03 27 20 - Bid date changed to 4/2

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT