2020 Waterline
BID DATE
03/18/20 - 2:00
AGENCY
Morgan
ESTIMATE
n/a
SCOPE
The Project consists of furnishing & installing approximately 3,050 lf of 8” Ductile Iron Pipe water main with locator tape, connections, gate valves, fire hydrants, approximately 1070 lf of 1” Type K copper water service pipe, relocate existing meter box, yoke, meter, and lid to new location on property line. Includes two (2) Bores across State Street and on 700 East using 20” steel casing and three (3) bores across 700 East using 2” steel casing. Also includes removal and replacement of sidewalk, curb and gutter, and restoring surface improvements including import granular backfill if needed and asphalt patching. https://jonescivil.com/projects/2020-waterline-projects/

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT