Access the Full Project by Clicking here!
Bidjugde
JOB
2020 Overlay
BID DATE
04/14/20 - 2:00
AGENCY
Atherton
ESTIMATE
$324,616
SCOPE
Removal and replacement of 2 inches of asphalt concrete pavement on Polhemus Lane (between Selby Lane and Alameda de Las Pulgas). Once roadway is grinded down, the contractor and the Town’s project engineer shall identify any pavement failures for repairs. Grind and replace approximately 5,000 square feet of asphalt to a 4-inch depth; then contractor shall perform crack sealing (per specification). Some hand work around utility access-hole covers will be necessary. Repave the entire street with a self-propelled paver & finish per Town Standard Specifications. Striping and pavement marking installation is also included in this project. dhuynh@ci.atherton.ca.us
UPDATES