jobs bidding

Access the Full Project by Clicking here!

- SIGN UP -
Experience Simplicity
 
 
 
 
 
JOB
Alleyways Industrial Roads Pavement Rehab
BID DATE
04/2/20 - 10:00
AGENCY
Azusa
ESTIMATE
n/a
SCOPE
The work to be performed or executed under these specifications consists of 2 inch removal of asphalt, base, and/or native soil, and construct 2 inch C2 ½ inch PG 64-10 finish course asphalt concrete within Alleyways. 3 inch removal of asphalt, base, and/or native soil, and construct 1.5inch C2 ½ inch PG64-10 finish course asphalt over 1.5 inch B ¾ inch base course asphalt concrete within Industrial Roads. Removal and replacement of ADA ramps, alley intersections, sidewalk, and curb and gutter. Adjustment of utility valves, and pull boxes throughout the scope of the project. pflores@azusaca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT