Citywide Non Potable Water Distribution System
BID DATE
07/7/20 - 2:00
AGENCY
Brentwood
ESTIMATE
$6,200,000
SCOPE
The Project is located at 230 Fairview Avenue; along Sand Creek Road; along Fairview Avenue, and is described as follows: Installation of new 16-inch and 12-inch main non-potable water (“NPW”) pipeline via slip-lining an abandoned 22-inch PG&E gas line; installation of new 18-inch and 16-inch NPW main lines via open trenching; connection to and utilization of existing 16-inch ECCID line; construction of new non-potable water booster pump station and controls building; and connections to existing irrigation system.