Access the Full Project by Clicking here!
Bidjugde
JOB
Stone Willow 20th Street Sewer
BID DATE
03/30/20 - 2:00
AGENCY
Safford
ESTIMATE
n/a
SCOPE
The purpose of the Stone Willow Sewer portion of the project is to furnish all labor, materials, equipment, traffic control and incidentals required for the installation of a 60-inch diameter sewer manhole over the existing 15-inch diameter sewer in 14th Avenue. The new manhole base will be poured around the existing 15-inch diameter and 12-inch diameter sewer pipes. The new manhole will be constructed with a slide gate to limit the quantity sewer flow into the existing 12-inch diameter sewer pipe. The purpose of the 20th Street Sewer portion of the project is to furnish all labor, materials, equipment, traffic control and incidentals required for the installation of 205 linear feet of 12-inch diameter sewer main along with one 60-inch diameter sewer manhole. Modifications will also be made to the two existing sewer manholes, one at the beginning and one at the end of the proposed sewer main line. Dave Shreeve at 928-428-3898 dshreeve@bowmansulting.com
PREBID
3/18/2020 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT