Access the Full Project by Clicking here!
Bidjugde
JOB
Navajo Gallup Water Supply Reach 27.10
BID DATE
04/14/20 - 2:00
AGENCY
Gallup
ESTIMATE
n/a
SCOPE
The project consists of constructing a 3.0 MG welded steel reservoir, a pump station, and altitude valve station, and an altitude valve vault at Cresto Water Tank along with installing approximately 9,450 linear feet of 16” CL350 ductile iron waterline, 3,380 linear feet of 12” CL 235 DR18 C900 PVC waterline, a 212 linear foot jack and bore crossing of NM State Road 602 with a 12” carrier pipe in a 20” steel casing and tie-ins to existing waterline lines. Work will also include air release stations, valves, fittings, specials, grading, excavation, trenching, backfilling, and compaction. Asphalt, gravel road surfacing and fencing will also be required. This project is located south of Gallup, New Mexico. The 16” waterline begins on the south side of Mendoza Road immediately south of the airport, runs southeast to the tank and pump station site. The site is located along the Old Zuni Road east of the intersection of Dusty Road and Cipriano Street. The 12” water line then runs east from the tank and pump station site, crosses NM State Road 602 and ends at the intersection of Dee Ann Ave and NM State Road 602 Frances Rodriguez frodriguez@gallupnm.gov
UPDATES