2020 Geneva Park Parking Lot
BID DATE
03/19/20 - 11:00
AGENCY
Orem
ESTIMATE
$445,000
SCOPE
The WORK will include 1450 SY of 3” asphalt 1/2" PG 58-28, 540 SY of 4” asphalt 1/2” PG 58-28, 80 CY of Granular Borrow, 550 LF of 2’ Concrete Curb and Gutter, 6 ADA Ramps, 3,250 SF of Concrete Flatwork, 101 LF of 8” DI Waterline, 159 LF of 4” DI Waterline,15 LF 2” Poly Waterline, 75 LF of 1” Poly Waterline, 253 LF of 8” SDR-35 PVC Sewer Pipe, Storm Drain Improvements including 240 LF of storm drain pipe and structures, 135’ of 1” Power Conduit with junction boxes and restriping all parking lots shown on the plans. The engineer’s estimate is $375,000 to $445,000. Kyra Wright +1 801-229-7315 kmwright@orem.org
PREBID
3/5/2020 11:00