Access the Full Project by Clicking here!
Bidjugde
JOB
Kingman-Ash Fork Hwy (NH-IM-040-B(214)T)
BID DATE
03/21/14 - 11:00 LIVE!
AGENCY
ADOT
ESTIMATE
$7,500,000
SCOPE
The proposed work is located in Yavapai County on Interstate 40 near Ash Fork. The work begins at milepost 143.63 and extends easterly to milepost 147.15. The work consists of rehabilitating ten bridge decks within the project limits and constructing temporary access roads and median detour crossovers. The work includes removing and replacing bridge decks and approach slabs on the eastbound (EB) and westbound (WB) Ash Fork Draw Bridges; repairing bridge decks using hydrodemolition and microsilica modified concrete overlay on the EB and WB West Ash Fork traffic interchange (TI) overpass (OP) and the EB and WB East Ash Fork TI OP; repairing bridge decks using mechanical milling and polymer epoxy overlay for the EB Burlington Northern Santa Fe (BNSF) Railroad OP and the Ash Fork Draw Ramp-A and Ramp-B Bridges, repairing bridge deck using mechanical milling and microsilica modified concrete overlay for the WB Ash Fork BNSF Railroad OP; installing deck joint assemblies; applying methacrylate, and other related miscellaneous work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT