Access the Full Project by Clicking here!
Bidjugde
JOB
South Trunk Sanitary Sewer Relief - Phase I
BID DATE
03/21/14 - 2:00
AGENCY
San Mateo
ESTIMATE
$7,000,000
SCOPE
The South Trunk Phase 1 Project is located within City street right-of-way and City property and crosses California Department of Transportation right-of-way at US-101. Project consists of 48-inch and 54-inch gravity sewer pipe installation with a 66” casing within the Caltrans ROW at depths of approximately 35 feet below ground surface and the installation of access junction box manholes. Pipeline installation is to be constructed by microtunneling trenchless construction method. Shaft installation to support microtunneling is to be constructed by auger drilled shaft, secant pile, or cutter soil construction methods.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT