Access the Full Project by Clicking here!
Bidjugde
JOB
Phase 1 Recycled Water Facilities (REBID)
BID DATE
10/19/21 - 2:00
AGENCY
Davis
ESTIMATE
$1,800,000
SCOPE
Ghilotti Construction Co. - $1,519,519 GSE Construction - $1,662,400 Anvil Builders - $1,673,000 T&S Construction Co - $1,675,000 Auburn Constructors - $1,785,300 McGuire & Hester - $1,849,700 Swierstok Enterprise Pro Builders - $1,980,000 RJ Gordon Construction - $2,115,000 Construct a recycled water pump station as shown on the Contract Documents, which includes a single vertical turbine pump driven by a variable speed drive, situated outdoors in a below-grade concrete structure. Install a suction pipeline from existing chlorine contact tank effluent channel to the new pump station. Install a discharge pipeline from the new pump station to the existing pipe underneath the levee. Install a pipeline from the the existing pipe underneath the levee to the recycled water discharge locations at the Recycled Water Storage Pond 1 and the Return Channel. Connect the new recycled water pipeline to the existing 24” OVFI pipeline. Install electrical equipment in the existing Filter Electrical Building and at the Recycled Water Pump Station. Construct a recycled water pump station as shown on the Contract Documents, which includes a single vertical turbine pump driven by a variable speed drive, situated outdoors in a below-grade concrete structure. Install a suction pipeline from existing chlorine contact tank effluent channel to the new pump station. Install a discharge pipeline from the new pump station to the existing pipe underneath the levee. Install a pipeline from the the existing pipe underneath the levee to the recycled water discharge locations at the Recycled Water Storage Pond 1 and the Return Channel. Connect the new recycled water pipeline to the existing 24” OVFI pipeline. Install electrical equipment in the existing Filter Electrical Building and at the Recycled Water Pump Station. Construct a recycled water pump station as shown on the Contract Documents, which includes a single vertical turbine pump driven by a variable speed drive, situated outdoors in a below-grade concrete structure. Install a suction pipeline from existing chlorine contact tank effluent channel to the new pump station. Install a discharge pipeline from the new pump station to the existing pipe underneath the levee. Install a pipeline from the the existing pipe underneath the levee to the recycled water discharge locations at the Recycled Water Storage Pond 1 and the Return Channel. Connect the new recycled water pipeline to the existing 24” OVFI pipeline. Install electrical equipment in the existing Filter Electrical Building and at the Recycled Water Pump Station. https://www.davisplanroom.com/jobs/124/details/phase-1-recycled-water-facilities tjue@cityofdavis.org
UPDATES