Access the Full Project by Clicking here!
Bidjugde
JOB
Concrete Removal Replacement Various Locations
BID DATE
03/5/20 - 2:00
AGENCY
Anaheim
ESTIMATE
n/a
SCOPE
The work to be performed under this contract consists of furnishing all labor, materials, tools, equipment and incidentals required to perform concrete work of existing Portland Cement Concrete (PCC or P.C.C.) structures; the work also includes removal and reconstruction of PCC sidewalk, ADA access ramps reconstruction and installation, curb and gutter replacement, cross gutters, truncated domes, alley gutter replacement, finish grading, site concrete, concrete reinforcement, landscape irrigation and all appurtenant work.Assessment typically includes current condition, geometry, digital images, maps and/or drawings, and improvement recommendation; it also identifies the type of failure in the PCC structure, no to the limit of Buckling, Corner breaks, Divided Slabs, Durability Cracking, etc. Lorenzo H Rea - 714-765-6893 lrea@anaheim.net

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT