Access the Full Project by Clicking here!
Bidjugde
JOB
Water Distribution System Phase 2
BID DATE
03/9/20 - 1:00
AGENCY
Antelope Peak DWID
ESTIMATE
n/a
SCOPE
The Project consists of the Base Bid construction of 1,087 linear feet of 6 inch AWWA C900, DR 18 PVC Water Pipe, 11,614 linear feet of 4 inch AWWA C900, DR 18 PVC Water Pipe, 42 - �" water services with meters, 7 - �" water services without meters, valves, fittings and appurtenances together with the construction of 1,209 linear feet of 6 inch AWWA C900, DR 18 PVC Water Pipe, 650 linear feet of 3 inch AWWA C900, DR 18 PVC Water Pipe, 2 - �" water services with meters, 3 - �" water services without meters, valves, fittings and appurtenances as 2 Additive Bids. Bids will be received for a single prime Contract. dnacivil@aol.com
PREBID
3/6/2020 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT