Access the Full Project by Clicking here!
Bidjugde
JOB
Las Vegas Boulevard MAX Transit Stations ADA Improvements
BID DATE
03/10/20 - 4:00
AGENCY
Regional Transportation Commission
ESTIMATE
n/a
SCOPE
The work includes, but is not limited to the Las Vegas Boulevard MAX Stations ADA Improvements project is located between Carey Avenue to Craig Road. The project involves 14 MAX Stations that require removal of the existing tactile warning panels on the transit platforms that are in disrepair and install new panels integral to the transit platforms. Work shall include, but not limited to (a) removal and replacement of the existing platforms and ramps at each of the MAX Stations (b) removal of the existing curb and gutter with integral trench drains, and construction of new curb and gutter (c) protection of existing features not designated for removal (d) traffic control (e) ex. utilities to be located both horizontally and vertically prior to commencement of removal operations due to high-pressure gas line, other overhead and underground utilities are located within the project area (f) coordination with utility providers is described in Section 105 of the Special Provisions (g) compliance with NDOT, City of North Las Vegas and Clark County requirements as described in Section 107 of the Special Provisions. alexanderro@rtcsnv.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT