Ritter Drive Reconstruction Phase 2
BID DATE
02/25/20 - 2:00
AGENCY
Riverdale
ESTIMATE
n/a
SCOPE
The work includes furnishing all labor, tools, materials, equipment, transportation, and services required for construction of the above projects; consisting of the following items of work: mobilization; obtaining all bonds and insurance, removal of existing asphalt and roadbase street surface materials; removal of curb & gutter, sidewalk and other flatwork; removal of miscellaneous landscaping and trees; installation of approximately 2,050 feet of curb and gutter, sidewalk, roadbase and approximately 1,250 tons of bituminous asphalt; furnishing and installing approximately 670 feet of 15-inch rcp storm water pipe, storm water manholes, combo boxes and catch basins, furnish and install fire hydrant, relocate water meters and replace service laterals