Oakwood Crestwood Maplewood Streets Rebuild
BID DATE
02/25/20 - 10:00
AGENCY
Ogden
ESTIMATE
n/a
SCOPE
The work consists of reconstruction 12,300 s.y. of road surface including: removal of existing asphalt, road base and sub-grade material; installation and compaction of granular barrow, untreated base course, and hot mix asphalt; removal and replacement of 300 l.f. of curb and gutter, 400 l.f. of concrete sidewalk. The work also includes the replacement of culinary water service laterals, valves and fire hydrants and 3,400 l.f. of culinary waterline, installation of 400 l.f. of land drain pipe and all other related items and appurtenances as directed in the Contract Documents. Wasatch Civil Consulting Engineering

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT