Access the Full Project by Clicking here!
Bidjugde
JOB
Lower 1 Recycled Conveyance System
BID DATE
02/27/20 - 2:00
AGENCY
Oceanside
ESTIMATE
$19,125,600
SCOPE
The work includes construction of 39,540 linear feet of recycled water pipeline and appurtenances within the City of Oceanside, originating at the San Luis Rey Water Reclamation Facility. Pipeline diameters range between 10 to 18-inches. The work includes multiple horizontal directional drill crossings of the San Luis Rey River adjacent to Douglas Drive. ptunnell@oceansideca.org
PREBID
2/11/2020 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT