Access the Full Project by Clicking here!
Bidjugde
JOB
Sewer Pipeline Manhole Rehabilitation FY2020
BID DATE
03/5/20 - 2:00
AGENCY
Coachella Valley Water District
ESTIMATE
$550,000
SCOPE
The project consist of work in three different areas as noted below. The River at Rancho Mirage: This portion of the Project consists of rehabilitating two (2) existing sewer manholes with manhole structural inserts and manhole bypass (if required).Desert Crossing Shopping Center: This portion of the Project consists of rehabilitating seven (7) existing sewer manholes with manhole structural inserts and manhole bypass (if required).One Eleven Town Center: This portion of the Project consists of spot repair (sectional repair) of approximately 170 LF of 8" Cured in Place Pipe (CIPP) and all related work, including pre-lining CCTV inspections, sewer cleaning, liner installations, post lining CCTV inspections, and sewer bypass pumping (if required). Jignesh Ladhawala, 760-398-2661 x2789 Jignesh Ladhawala@cvwd.org
UPDATES