Access the Full Project by Clicking here!
Bidjugde
JOB
Civic Center Way Storm Drain Repair
BID DATE
02/14/20 - 4:00
AGENCY
Malibu
ESTIMATE
n/a
SCOPE
The project consists of removing an existing 84-inch corrugated metal pipe and replacing it with 54-inch reinforced concrete pipe. The work also includes repairing the bottom of the existing 84-inch corrugated metal pipe with concrete. rduboux@malibucity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT