Access the Full Project by Clicking here!
Bidjugde
JOB
Pedestrian Improvements Various Locations
BID DATE
02/25/20 - 2:00
AGENCY
Turlock
ESTIMATE
$290,000
SCOPE
The work consists, in general of: furnish and install rectangular rapid flash beacon (RRFB) solar system with signage at four crosswalk locations, furnish and install type 1-A poles, construct concrete curb, gutter and sidewalk, underdrain pipe, minor hot mix paving, crosswalk marking/striping and other associated work. RJONES@TURLOCK.CA.US engineering@turlock.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT