Access the Full Project by Clicking here!
Bidjugde
JOB
Street Rehabilitation FY 2020
BID DATE
02/20/20 - 2:00
AGENCY
Berkeley
ESTIMATE
$3,500,000
SCOPE
The work done under these specifications includes but is not limited to: traffic control, environmental protections, adjustment of valve boxes and utility boxes, frames, and covers, replacement of survey monuments, protection of underground utility services (e.g. gas, water, sewer, electrical, telecom), concrete curbs and gutters, sidewalk, curb ramps, driveways, cross drains at curb ramps, crack sealing, base failure repairs, slurry seal, cold planing, removal and disposal of pavement surfaces and base materials, stabilization, hot-mix asphalt (HMA) and rubberized hot-mix asphalt (RHMA) paving, pavement markings, striping, markers, signage, and traffic loops as specified. wwong@cityofberkeley.info

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT