Ebbetts Pass Water System Techite Pipeline Replacement
BID DATE
03/12/20 - 2:00
AGENCY
Calaveras County WD
ESTIMATE
$2,000,000
SCOPE
The District invites bids for construction of its Ebbetts Pass Water System Techite Pipeline Replacement project near Dorrington, CA in Big Trees Village. The existing 14-inch Techite water main, originally installed in the 1970’s, is a thin walled fiberglass composite material that is fragile, susceptible to line breaks and difficult to repair. The project consists of construction of 6,900-ft of new 10-inch dia. ductile iron water main including eighty (80) water services, seven (7) fire hydrants, (4) air valves, one (1) pressure reducing station. The alignment starts on Big Foot Circle crossing northeast to Ottawa Dr. and Blackfoot Circle, and continues along Meko Dr. ending at Hwy 4. Approximately 4,100-LF of the new 10-in dia. water main will be constructed by open-cut trench parallel to the existing main, and 2,800-LF of 10- inch dia. water main will be installed by removing and replacing the existing 14-inch dia. Techite main in the same trench. Temporary above ground bypass piping will be used to maintain continuous water service to customers that are within the 2,800-LF of main that is to be replaced in the same trench. Also, the Contractor is responsible for encroachment permits, traffic controls, and stormwater pollution prevention measures. Engineer's Estimate is $2 million.
PREBID
2/19/2020 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT