Access the Full Project by Clicking here!
Bidjugde
JOB
Runway 25L Rehabilitation Los Angeles International Airport
BID DATE
02/11/20 - 2:00
AGENCY
Los Angeles
ESTIMATE
n/a
SCOPE
The Runway 25L Rehabilitation Project at Los Angeles International Airport includes, but is not limited to, replacement of the existing wearing surface of asphalt overlaid runway areas with new P401 Asphalt wearing surface, bridge repairs, exit taxiway pavement replacement, airfield lighting upgrades, and pavement markings; rehabilitation of the runway pavement (keel section), exit taxiways (H6 and H7), replacement of bridge approach slabs, surface repair of existing bridge structure, and LED upgrade of airfield lighting; mill of the existing runway wearing surface over an extended Keel Section, in addition to the exit Taxiways H6 & H7, and replace with a 3” asphalt wearing surface, and other related work. For full details of the required scope for this project, please see the Contract Documents. pdgprocurement@lawa.org https://www.labavn.org/index.cfm?fuseaction=contract.opportunity_view&recordid=38607&CFID=22921075&CFTOKEN=ca78683449f5c94b-6E8BA44A-C723-6AD7-3DD81DEEEA475075
UPDATES