2018 2019 Arterial Minor Streets Maintenance Phase 1 2
BID DATE
02/13/20 - 2:00
AGENCY
Riverside
ESTIMATE
$6,122,332
SCOPE
The project entails maintenance improvements on Minor streets and one Arterial Street throughout the City of Riverside. The Arterial Street will be Canyon Crest Drive from 450 feet north of intersection of University to the Spruce Street intersection. This project generally includes, but is not limited to, the reconstruction of asphalt pavement, ARAM, concrete sidewalks, driveways, pedestrian ramps, cross gutters, curb and gutters; adjustment of water meter boxes, water valve covers and sewer, storm drain and electrical manholes; removal and replacement of traffic striping; and installation of traffic signs. The project also includes a median and signing/striping modification at SR-91 Eastbound exit ramp at Central Avenue.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT