Access the Full Project by Clicking here!
Bidjugde
JOB
Oakwood Localized Drainage Management
BID DATE
02/19/20 - 3:00
AGENCY
Redwood City
ESTIMATE
n/a
SCOPE
The work for this project will generally consist of the construction of two (2) - 48” perforated storage pipes in infiltration basins, concrete gutter, two (2) bio-retention areas, and associated work including a 12” pipe, two manholes with risers, concrete curbs, temporary irrigation and surface restoration.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT