Access the Full Project by Clicking here!
Bidjugde
JOB
Runway 30L Threshold Reconstruction and Detention Basin Mid Phase 1
BID DATE
03/13/14 - 2:00
AGENCY
PMGAA
ESTIMATE
$1,750,000
SCOPE
The intent of the Runway 30L Threshold Reconstruction portion of the project is the re-construction of the Runway 30L Threshold as presented on the plans and specifications. The Project consists of the construction of Portland Cement Concrete (PCC) pavement on a prepared subgrade and includes site grading, earthwork, lime subgrade stabilization, crushed aggregate base course, asphalt base course, asphalt concrete shoulder pavement, runway edge lights, and pavement marking. The major construction items associated with this portion of the project include the following: 1. Construction of approximately 3,000‘ x 150’ LF of Runway consisting of approximately 50,000 SY of 16 inch thick Portland Cement Concrete Pavement (PCCP), asphalt base course, and lime stabilized subgrade; 2. Re-construction of a portion of the asphalt concrete shoulder; 3. Placement of crack seal and seal coat on runway shoulders; 4. Placement of runway markings; 5. Installation of runway edge lights. JAlbin@phxmesagateway.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT