JOB
Sandhill Interceptor
BID DATE
03/5/20 - 2:00
AGENCY
Clark County Water Reclamation
ESTIMATE
$43,900,000
SCOPE
The Work includes: Installation of approximately 8,335 linear feet of 60-inch diameter interceptor sewer using open-cut and trenchless methods, 72-inch polymer concrete manholes, a diversion structure of the Crosstown Interceptor; a wye connection to the Paradise Whitney Interceptor both of which requires removal and replacement of a portion of the existing interceptor. Construction includes utility relocations, sewer and water realignments, access shaft construction, traffic control, large flow bypass pumping, groundwater and all other appurtenant work required to construct the specified facilities. The Engineer’s estimate is in the $37.6M to $43.9M range