Pine St 800 Block Storm Drainage Improvements
BID DATE
01/28/20 - 1:00
AGENCY
Monterey
ESTIMATE
$675,000
SCOPE
Pine Street 800 Block Storm Drainage Improvements, Hawthorne/Irving Bulbouts, Hawthorne/McClellan Bulbouts. In general, the work consists of, but is not limited to, construction of new storm drain inlets at 899 Pine, 1003 David, and 999 Irving; replacing drain inlets at 835, 856, and 857 Pine, 805 Oak and 1021 Irving; retrofitting curb ramps at Irving/Oak; and construction of curb ramps and bulb-outs at Hawthorne/Irving and Hawthorne/McClellan. The work shall include, but not be limited to, implementation of temporary water pollution controls and temporary traffic controls, construction staking, saw cutting and demolition, and construction of storm drain inlets, storm drain manhole, curb, gutter, sidewalk, curb ramps, and HMA paving. krebs@monterey.org