Access the Full Project by Clicking here!
Bidjugde
JOB
Camino Rincon Road Water Sewer Improvements Phase 1B Phase 4
BID DATE
02/13/20 - 12:00
AGENCY
Pecos
ESTIMATE
n/a
SCOPE
The Camino Rincon Water and Sewer Improvements, Phase 1B to Phase 4 project includes installation of a new sewer collection system and replacement of the existing water lines within the Camino Rincon area. The sewer and water are broken up in to four phases (Base bid, plus three additive alternates), as described below. All phases the of sewer lines include a service line connection to the existing residence sewer outfall and not just to the edge of property; successful bidder will need to coordinate with property owners in order to determine final locations for all service lines; approximate lengths of sewer services are provided for bidding purposes. All existing water service lines are to be transferred to the new line with minimal service interruption. Asphalt within NM-63 is to be removed and replaced from edge of pavement to the crown and replaced. All asphalt work in Camino Rincon is included in the scope of this project. Ross Gabaldon (505) 948-5123 ross.gabaldon@wilsonco.com https://www.wilsonco.com/plan-room/camino-rincon-water-and-sewer-improvements-phase-1b-phase-4
UPDATES