Access the Full Project by Clicking here!
Bidjugde
JOB
Zone 1W Tank Transmission Main
BID DATE
01/24/20 - 2:00
AGENCY
Bluffdale
ESTIMATE
n/a
SCOPE
This project consists of waterline and pressurized irrigation pipe installation and repaving of 15000 South and 2700 West. Construction will consist of but not limited to 4,600 LF of 24-inch water pipe, 2,000 LF of 16-inch water pipe and 6,600 LF of 12-inch pressurized irrigation pipe including a 36-inch jack and bore and a 24-inch jack and bore. This pipeline works will include installation of valves, bends, tees, air vacuum valves, water and PI services. This project also includes the installation of new 18-inch, 24-inch and 30-inch storm drain pipe, including curb inlets and manholes, regrading of an existing stormwater pond with sod and sprinkler relocation. Additionally, this project includes repaving of approximately 2 miles of roadway along with 1 street light and 1 ADA compliant pedestrian crossing. Marcia Adler madler@bluffdale.com
PREBID
1/16/2020 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT