JOB
Sewer AC Water Group 765
BID DATE
02/6/20 - 2:00
AGENCY
San Diego
ESTIMATE
$5,286,000
SCOPE
Construction of Sewer & AC Water Group 765 consists of the installation of approximately 5,382.58 linear feet of 8-inch, 10-inch, and 12-inch sewer mains to replace-in- place existing 8-inch and 10-inch sewer mains, and installation of approximately 6,210.82 linear feet of 8-inch water main to replace-in-place existing 6-inch and 8-inch AC water mains. Related work includes potholing, traffic control, street resurfacing, and installation of sewer manholes, sewer laterals, water services, water fittings and couplings, fire hydrants, curb ramps, and construction best management practices (BMPS). Taylor Cox - 619-533-3033 TJCox@sandiego.gov