Access the Full Project by Clicking here!
Bidjugde
JOB
2017 Winter Storm Recovery Blagen Road Repair
BID DATE
05/26/21 - 3:00
AGENCY
Calaveras County
ESTIMATE
$299,000
SCOPE
This project, generally described, consists of culvert, reinforced concrete headwall and roadway construction and rock slope protection on Blagen Road where it crosses Big Trees Creek near Arnold, CA. The culvert is approximately 52’ long and 48” diameter. Approximately 150’ of roadway needs to be constructed to restore condition to the pre-washout condition. The new roadway and culvert headwall will be constructed from reinforced concrete with spread footings for the headwall foundations. Blagen Road is currently open to one lane of through traffic and will remain open during construction. Documents Mark D. Ksenzulak (209) 754-6633 mksenzulak@co.calaveras.ca.us
UPDATES