SCOPE
degrading and reconstructing 2+ miles of levee (~150,000 cubic yards) to support construction of both Deep Mix Method (DMM) and slurry trench cutoff walls; constructing drained stability berms and seepage berms (~30,000 cubic yards); reusing excavated soils that meet specification criteria for reuse as levee fill; importing soil for levee fill as necessary; managing and disposing of excess excavated soils; removing and replacing 2+ miles of paved bike paths, researching, potholing, protecting, removing, and replacing existing utilities as shown on the plans and as needed to perform the work; removing all temporary facilities; and restoring and seeding all disturbed areas. DeAnna L. Mannel deanna.l.mannel@usace.army.mil Phone Number916-557-6690