Access the Full Project by Clicking here!
Bidjugde
JOB
St. Malo Forcemain Upgrades
BID DATE
02/11/14 - 10:00
AGENCY
Oceanside
ESTIMATE
$150,000
SCOPE
1. Replacement of the existing 4” Force Main with a 6” HDPE force main constructed mainly through utilizing Horizontal Directional Drilling construction methods. 2. Construction of new valve vault for new force main with isolation valves, check valves, bypass piping, hatches, etc. 3. New gravity manhole at the point of connection for the new force main 4. Rehabilitation of existing manhole where existing force main terminates amyczajkowski@parccivil.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT