Coast Pump Station 20 inch Pipeline Replacement
BID DATE
02/7/20 - 2:00
AGENCY
Santa Cruz
ESTIMATE
$3,000,000
SCOPE
1. Install approximately 220 feet of 24” pipe using trenchless microtunnel technology under the San Lorenzo River 2. Install approximately 300 feet of 24” pipe via open trench on either side of the San Lorenzo River to connect to the existing 20” and 24” raw water mains 3. Abandon existing pipeline under the river 4. Spoils disposal/dewatering efforts mkyotani@cityofsantacruz.com
PREBID
1/15/2020 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT