Main Street OHara Ave Intersection Improvement
BID DATE
02/27/20 - 2:00
AGENCY
Oakley
ESTIMATE
$630,000
SCOPE
Mobilization and demobilization; traffic control and construction signage; removal and replacement of traffic striping, marking, and markers; removal of curbs and gutters, removal of sidewalks and retaining walls, clearing and grubbing, roadway excavation, common excavation removal of pavement and base material, removal of subbases, native material fill, construction of new concrete curb and gutter, sidewalk, median islands, curb ramps, rubberized hot mix asphalt (RHMA), hot-mix asphalt (HMA) pavement and base; storm drain improvements; utility rearrangements, traffic signal, signing and striping, planting and irrigation, pots on plinths, and other work as shown on the Contract Plans, as specified in the Contract Documents, and as directed by the City Engineer.