JOB
McAllister Pump House Pipeline
BID DATE
01/31/20 - 3:00
AGENCY
Flagstaff
ESTIMATE
n/a
SCOPE
This project consists of the construction and equipping of a municipal water pump station, the associated piping between an existing well head and the pump station, piping between the pump station and the municipal distribution system, piping from the pump station to an existing wastewater collection line, all of the associated electrical equipment and conduits connecting the various components of this system. Site preparation, access road improvements, and pipeline route preparations, and the restoration of a short section of historic fence will be required. There is a high likelihood that significant rock will be encountered during pipeline trenching and possibly pump station foundation excavation. Electrical, controls, communications, equipment testing, commissioning, and staff training with equipment manufacturers to be included. Patrick Brown, C.P.M. CPPB - 928-213-2277 pbrown@flagstaffaz.gov
UPDATES