Access the Full Project by Clicking here!
Bidjugde
JOB
Elk Run Deer Forest Drive Bulb Outs Mule Deer Way Resurfacing
BID DATE
01/28/20 - 2:00
AGENCY
Monterey
ESTIMATE
n/a
SCOPE
Elk Run/Deer Forest Drive Bulb Outs and Mule Deer Way Resurfacing. In general, the work consists of, but is not limited to the construction of curb bulb-outs, curb ramps, soldier pile retaining wall and tree box filter, including temporary traffic control, temporary water pollution control, construction staking, tree removal, sawcutting and demolition of asphalt and concrete pavements, earthwork, concrete curb, gutter, sidewalk, and curb ramp construction, storm drain system modifications, retaining wall construction, HMA and concrete paving, and signing and striping.
PREBID
1/8/2020 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT