Access the Full Project by Clicking here!
Bidjugde
JOB
2020 Sewer Water Repair Replacement
BID DATE
01/22/20 - 3:00
AGENCY
Woodland
ESTIMATE
$5,000,000
SCOPE
The project generally includes repair and replacement of water mains and service laterals as well as sanitary sewer lateral and mainline replacement/lining on Gibson Road, between West and East Streets. Additionally, approximately 2,000 linear feet of new 18-inch PVC sewer main will also be constructed on East Street (from Gibson Road to Gum Avenue). More than 6,500 linear feet of mainline water pipe will be replaced with new 8 to 12-inch diameter mains on Gibson Road (from West Street to East Street). Residences served by the new main will be reconnected with new polyethylene services. Once completed, the project will result in more reliable water pressure and uninterrupted water service for approximately 130 residences. The project has also identified sanitary sewer defects in the same area and will rehabilitate approximately 75 sewer laterals and line more than 7,500 linear feet of sewer mains. Finally, the existing force main that carries flows discharged from the Gibson Ranch Sewer Lift Station will also be rerouted by directionally drilling a new fused PVC line across Gibson Road at County Road 102 to a parallel sewer interceptor with larger capacity than the gravity main to which the force main is currently connected. Ed Wisniewski ed.wisniewski@cityofwoodland.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT