Access the Full Project by Clicking here!
Bidjugde
JOB
Annual Asphalt Overlay
BID DATE
12/31/19 - 2:30
AGENCY
Las Vegas
ESTIMATE
$8,000,000
SCOPE
The work will consist of removal and replacement of asphalt pavement, installing new traffic delineations, markings, and symbols, installation of flasher assembly, installation of traffic signal assembly, and installation of traffic loop detectors. The work includes adjusting utility covers to grade with concrete collars, dense grade asphalt overlay and patching, cold milling and 1” thick ultra thin asphaltic concrete surface (UTACS) S3 gradation. Additional work may or may not be authorized by the Contracting Agency based upon the availability of funding. jwhill@lasvegasnevada.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT