JOB
Sewer System Repair Program Structural Reach Replacement
BID DATE
01/30/20 - 2:00
AGENCY
Los Altos
ESTIMATE
$3,215,000
SCOPE
The project includes, but is not limited to, the removal and replacement of existing 6-inch, 8-inch, and 15-inch VCP sewer mains with 8-inch and 15-inch PVC sewer mains using open trench pipe replacement construction method, and with 8-inch HDPE sewer mains using pipe reaming/horizontal directional drilling (HDD) pipe replacement construction methods, sewer lateral reconnections, sewer manhole reconnections, surface restoration, traffic control, mobilization, stormwater control, utility coordination, sewage bypassing, video inspection of the segments, removal of outside drop pipe system, survey referencing and reinstallation of existing survey monuments, and all other work as shown on the Plans and as called for in the Project Specifications and as directed by the Engineer.