Silverrock Way Street Improvements
BID DATE
01/23/20 - 10:00
AGENCY
La Quinta
ESTIMATE
n/a
SCOPE
SilverRock Way is being re-aligned through the SilverRock Resort Property. In its current state it has been rough graded to the proposed sub-base with a temporary connection to the existing SilverRock Way alignment and with a canal box culvert structure with no paving over the existing canal crossing. For this phase the contractor will construct temporary paving on the temporary connection and construct the final paving improvements which will stop at the location of the future roundabout at Jefferson Street and Avenue 53. Proposed improvements include temporary paving, sub-base preparation, construction of a full pavement section of asphalt concrete and aggregate base, curb and gutter, sidewalk/cart path, signing and striping, drainage improvements, empty conduit installation, construction of a water line, construction of a sewer line, water and sewer borings under the CVWD Canal, and paving over the existing canal structure.
UPDATES