Access the Full Project by Clicking here!
Bidjugde
JOB
Naples Island Permanent Seawall Repairs Phase I
BID DATE
02/20/14 - 11:00
AGENCY
Long Beach
ESTIMATE
$8,800,000
SCOPE
The Work consists primarily of installation of a new steel sheet-pile seawall on the water side of the existing vertical concrete seawalls along both sides of Rivo Alto Canal (approximately 1,915 lineal feet), construction of a new pile cap, new guardrails, landscape beds, sidewalks, an improved drainage system, and modified access platforms, pipe moorings and ladders; relocation of existing street lighting along the canal; and all necessary cleaning and trash removal throughout construction, implementing temporary construction BMPs, and all necessary incidental work required to perform all operations in connection with the Work as shown on the Plans and Specifications. Anne.Takii@longbeach.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT