2019 Sewer Rehabilitation
BID DATE
12/11/19 - 9:00
AGENCY
Orem
ESTIMATE
$1,900,000
SCOPE
The WORK includes the installation of approximately 3,970 linear feet of 8” SDR35 PVC sanitary sewer pipe, 409 linear feet of 12” SDR35 PVC sanitary sewer pipe, (24) 60” Ø sewer manholes, (1) 48” Ø sewer manhole, 2,090 linear feet of 8” DI waterline, (4) fire hydrant assemblies, 200 linear feet of 12” SDR35 PVC storm drain pipe, 12 linear feet of 18” SDR35 PVC storm drain pipe, 82 linear feet of 21” SDR35 PVC storm drain pipe, 20 linear feet of 18” RCP irrigation pipe, (8) pre-treatment catch basins, (5) sumps, (4) concrete driveway approaches, and (5) ADA ramps. The engineer's estimate for the work is $1.7M to $1.9M. Carlos Garcia +1 801-229-7318 clgarcia@orem.org