Reconstruct a Portion of Taxiway B2 Reconstruct Runway 6R Overrun
BID DATE
02/28/14 - 2:00
AGENCY
Tucson Airport Authority
ESTIMATE
$500,000
SCOPE
The purpose of this project is to reconstruct a portion of Taxiway B2 and the Runway 6R Overrun at Ryan Airfield because these AC pavements have reached the end of their useful lives. 20110092 Reconstruct a Portion of Taxiway B2: This project consists the reconstruction of a 50-foot wide asphalt pavement area (approximately 5,300 SY) from the North entrance of the hangar area to the restaurant apron. In addition, a complete reconstruction of the southernmost pavement area of Taxiway B2 (approximately 6,000 SY). Reconstruction involves the milling and removal of pavement and aggregate base course, lime treatment of sub-grade, and install with 3 inches of asphalt pavement and re-stripe. 20112262 Reconstruct Runway 6R Overrun: This project consists of the reconstruction of the Runway 6R Overrun (approx. 8,000 SY) including but not limited to AC pavement milling (full-depth; approx.. 2-inches), lime-treated subgrade, new aggregate base course, asphaltic concrete pavement, paint striping, grading, and soil stabilization. sgranillo@flytucson.com.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT