Access the Full Project by Clicking here!
Bidjugde
JOB
Newport Pier Area Water Main Replacement
BID DATE
11/21/19 - 10:00
AGENCY
Newport Beach
ESTIMATE
$3,600,000
SCOPE
Balboa Boulevard (River Avenue to 44th Street): The work necessary for the completion of this contract includes: The abandonment of the 8-inch diameter cast iron transmission main; the construction of an 8-inch water transmission main replacement including all appurtenances, fittings, and connections with Balboa Boulevard within this stretch of the street; and the abandonment of several adjacent smaller size cast iron distribution mains.23rd Street: The work necessary for the completion of this contract includes: The abandonment of the 8-inch diameter cast iron transmission main; the construction of an 8-inch water transmission main replacement including all appurtenances, fittings, and connections with 23rd Street within this stretch of the street; and the abandonment of several adjacent smaller size cast iron distribution mains.Alleys: The work necessary for the completion of this contract includes: The removal and construction of the 6-inch and 8-inch diameter cast iron transmission main replacement on the alleys between 46th Street to 45th Street, 41st Street to 38th Street, and 31st Street to 23rd Street including all appurtenances, fittings, maintain service, and connections within Balboa Boulevard, River Avenue and Seashore Drive. Alfred Castanon - 949-644-3314 acastanon@newportbeachca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT