Access the Full Project by Clicking here!
Bidjugde
JOB
Leucadia Pump Station Rehabilitation
BID DATE
01/16/20 - 2:00
AGENCY
Leucadia Wastewater District
ESTIMATE
n/a
SCOPE
installation of five new dry pit submersible pumps, two new emergency basin submersible pumps, one new conditioning pump; new piping, valves, and appurtenances; odor control system; miscellaneous metals; minor structural modifications; and new electrical and instrumentation improvements and all other work necessary to complete the work in its entirety including, but not limited to, providing complete and operational temporary sewer bypass pumping system during construction of the Project; protecting the existing structures and facilities and maintaining sewer pump station service at all times; all necessary demolition and civil site work; obtaining all permits and conforming to all permit, jurisdictional and regulatory requirements; trenching, backfilling, compaction; sheeting, shoring, bracing; potholing; restore disturbed areas and surface improvements to original conditions; and all miscellaneous work as shown, specified and directed for a complete operating installation. The work will be located at 1960 La Costa Avenue, Carlsbad, California 92009.
PREBID
12/5/2019 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT